
{"id":1988,"date":"2025-08-11T14:41:03","date_gmt":"2025-08-11T07:41:03","guid":{"rendered":"https:\/\/vietmarinecontrol.com.vn\/?p=1988"},"modified":"2025-08-11T14:41:03","modified_gmt":"2025-08-11T07:41:03","slug":"vm-control-professional-cargo-inspection-at-thi-vai-general-port-tvp","status":"publish","type":"post","link":"https:\/\/vietmarinecontrol.com.vn\/en\/vm-control-professional-cargo-inspection-at-thi-vai-general-port-tvp\/","title":{"rendered":"VM CONTROL \u2013 Professional Cargo Inspection at Thi Vai General Port (TVP)"},"content":{"rendered":"<p data-start=\"58\" data-end=\"248\"><strong data-start=\"58\" data-end=\"246\">This morning, the surveyor team of VM CONTROL was present at Thi Vai General Port (TVP) to carry out a cargo condition survey during the loading process from the berth onto the vessel.<\/strong><\/p>\n<p data-start=\"250\" data-end=\"396\">While the cargo was still stored at the port yard, we conducted a comprehensive inspection and detailed examination of each shipment, including:<\/p>\n<ul data-start=\"398\" data-end=\"824\">\n<li data-start=\"398\" data-end=\"516\">\n<p data-start=\"400\" data-end=\"516\"><strong data-start=\"400\" data-end=\"445\">Condition of packaging and outer surface:<\/strong> Checking for any signs of tearing, wetness, punctures, or scratches.<\/p>\n<\/li>\n<li data-start=\"517\" data-end=\"594\">\n<p data-start=\"519\" data-end=\"594\"><strong data-start=\"519\" data-end=\"542\">Seals and markings:<\/strong> Cross-checking with documents to verify accuracy.<\/p>\n<\/li>\n<li data-start=\"595\" data-end=\"703\">\n<p data-start=\"597\" data-end=\"703\"><strong data-start=\"597\" data-end=\"625\">Cargo surface condition:<\/strong> Recording any stains, corrosion, warping, or damage, even at a minor level.<\/p>\n<\/li>\n<li data-start=\"704\" data-end=\"824\">\n<p data-start=\"706\" data-end=\"824\"><strong data-start=\"706\" data-end=\"746\">Storage conditions prior to loading:<\/strong> Observing storage locations, protective measures, dryness, and ventilation.<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"826\" data-end=\"986\">All information and photographs are recorded, documented, and reported in accordance with ISO standards to ensure transparency and traceability when required.<\/p>\n<p data-start=\"988\" data-end=\"1215\">When the cargo loading process from the berth onto the vessel began, VM CONTROL\u2019s surveyors were on site to <strong data-start=\"1096\" data-end=\"1179\">closely monitor every stage of lifting, lowering, moving, and stowing the cargo<\/strong>. We paid particular attention to:<\/p>\n<ul data-start=\"1217\" data-end=\"1752\">\n<li data-start=\"1217\" data-end=\"1342\">\n<p data-start=\"1219\" data-end=\"1342\"><strong data-start=\"1219\" data-end=\"1242\">Loading techniques:<\/strong> Ensuring the proper use of lifting equipment suitable for the cargo type, weight, and dimensions.<\/p>\n<\/li>\n<li data-start=\"1343\" data-end=\"1491\">\n<p data-start=\"1345\" data-end=\"1491\"><strong data-start=\"1345\" data-end=\"1365\">Safety measures:<\/strong> Checking the use of slings, cables, nets, pallets, or other protective means to prevent impact, slipping, or cargo falling.<\/p>\n<\/li>\n<li data-start=\"1492\" data-end=\"1612\">\n<p data-start=\"1494\" data-end=\"1612\"><strong data-start=\"1494\" data-end=\"1524\">Stowage location on board:<\/strong> Ensuring an even distribution of weight, avoiding excessive pressure or overstacking.<\/p>\n<\/li>\n<li data-start=\"1613\" data-end=\"1752\">\n<p data-start=\"1615\" data-end=\"1752\"><strong data-start=\"1615\" data-end=\"1640\">Lashing and securing:<\/strong> Inspecting securing points, lashing lines, turnbuckles, etc., to keep cargo stable throughout the sea voyage.<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"1754\" data-end=\"1913\">In addition, we monitored weather conditions, tides, and the working environment to promptly provide preventive recommendations if any adverse factors arose.<\/p>\n<p data-start=\"1915\" data-end=\"2298\">With years of hands-on experience, a systematic working process, and modern supporting equipment, VM CONTROL always ensures <strong data-start=\"2039\" data-end=\"2072\">accurate \u2013 timely \u2013 objective<\/strong> survey results. Our survey reports not only serve legal and insurance purposes but also act as a crucial tool for businesses to <strong data-start=\"2201\" data-end=\"2272\">minimize risks, protect cargo value, and safeguard brand reputation<\/strong> in international trade.<\/p>\n<p data-start=\"2300\" data-end=\"2384\">\ud83d\udccc <strong data-start=\"2303\" data-end=\"2382\">VM CONTROL \u2013 The trusted survey solution for every shipment, at every port.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>This morning, the surveyor team of VM CONTROL was present at Thi Vai General Port (TVP) to carry out a cargo condition survey during the loading process from the berth onto the vessel.<\/p>\n","protected":false},"author":2,"featured_media":1984,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[22],"tags":[],"class_list":["post-1988","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/vietmarinecontrol.com.vn\/en\/wp-json\/wp\/v2\/posts\/1988","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vietmarinecontrol.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vietmarinecontrol.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vietmarinecontrol.com.vn\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/vietmarinecontrol.com.vn\/en\/wp-json\/wp\/v2\/comments?post=1988"}],"version-history":[{"count":1,"href":"https:\/\/vietmarinecontrol.com.vn\/en\/wp-json\/wp\/v2\/posts\/1988\/revisions"}],"predecessor-version":[{"id":1989,"href":"https:\/\/vietmarinecontrol.com.vn\/en\/wp-json\/wp\/v2\/posts\/1988\/revisions\/1989"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vietmarinecontrol.com.vn\/en\/wp-json\/wp\/v2\/media\/1984"}],"wp:attachment":[{"href":"https:\/\/vietmarinecontrol.com.vn\/en\/wp-json\/wp\/v2\/media?parent=1988"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vietmarinecontrol.com.vn\/en\/wp-json\/wp\/v2\/categories?post=1988"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vietmarinecontrol.com.vn\/en\/wp-json\/wp\/v2\/tags?post=1988"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}